Contact Us
HOME >Case Studies> STEEL INDUSTRY

Crack Repair Of CI-Pump Housing

Industry Type
Steel

Product Group
Lotherme

OUR SOLUTION

Preheat(C)
150-200 C

Quantity (Kgs)
1.0

Current (amps)
80 - 120

Size (mm)
3.15

Product
Lotherme-703

JOB PICTURES
Job Sketch With Dimension

Job Sketch With Dimension

Job Sketch With Dimension

Job Sketch With Dimension

ANALYSIS

Base Metal
Cast Iron

Problem Due To
Vibration

Type Of Problem
Crack

Component Name
Ci-Pump Housing

Equipment Name
CI-Pump

1. The broken pieces are ground to shape & alignment was made. Pre-heating (150-200C) of the area is done.

2. Welding is carried out using Lotherme 703

3. After completion of welding the area is covered with asbestos cloths & cooled slowly to room temperature.

Further Reading on Case Studies

MSF Shaft Reconditioning In Furnace
Read Case Study
Crack Repair of Upper Protection Plate
Read Case Study