Contact Us
HOME >Case Studies> STEEL INDUSTRY

Feed Tube Prepared By Using Scrap

Industry Type
Integrated Steel

Product Group
Lotherme

OUR SOLUTION

Process
"Manual Metal Arc Welding With The Source Of Rectifier 400Amps"

Quantity (Kgs)
30, 40

Current (amps)
80-90, 120-140

Size (mm)
3.15, 4.00

Product
Lotherme -510N

JOB PICTURES

ANALYSIS

Dimensions (mm)
500 x 25 x 460

Comp. Weight (Kgs)
Approx 1 Ton

Base Metal
HK-40

Previous Solution
It Was Declared As Scrap

Problem Due To
Hot Flue Gases In The Klin & Height Of Raw Material Fall Is Very High

Type Of Problem
Wornout

Component Name
Feed Tube

Equipment Name
Spong Iron Klin Of 500Tpd

1. Collected two numbers of scraped feed tubes which were declared as scrap and managed to cut the required lengths with the help of plasma cutting machine.

2. Made the ‘v’ groove for the two joints, carried out the two layers of route run with lotherme 510n of 3.15mm

3. Successfully completed the job with lotherme-510 of 4mm.

4. Manpower and accessories provided by the bmm only, and we have supervised the job on free of cost

Further Reading on Case Studies

MSF Shaft Reconditioning In Furnace
Read Case Study
Crack Repair of Upper Protection Plate
Read Case Study
Crack Repair Of CI-Pump Housing
Read Case Study