Contact Us
HOME >Case Studies> CEMENT PLANTS

Pump Housing Flang Repair.

Industry Type
Cement

Product Group
Lotherme

OUR SOLUTION

Quantity (Kgs)
2

Current (Amps)
210

Size (mm)
4

Product
Lotherme 802

Quantity (Kgs)
4

Current (Amps)
105

Size (mm)
3.15

Product
Lotherme -705

ANALYSIS

Dimension (Crack Details) (mm) T×D
20×100

Base Metal
Cast Iron

Previous Solution
First time got repaired by D&H Secheron

Problem Due To
Heavy load

Type of Problem
Brocken

Component Name
Valve

Equipment
Housing

JOB PICTURES
AFTER STICH WELDING.

AFTER STICH WELDING.

AFTER USING THE LOTHERME 705

AFTER USING THE LOTHERME 705

1.        Removed the total piece using LOT 802  by gouging .

2.       Made thegrove both the piecess by grinding.

3.       Opposite sides putted the strich welding using our LOT 705.

4.       Total circumferencewelding  method followed cast iron welding and complited the welding.

Further Reading on Case Studies

Tip Casting
Read Case Study
Kiln Shell Multy Crack At Tyre Place
Read Case Study
Lime Stone Crusher Rotor Hard Facing
Read Case Study