Shovel Boom Crack Repair

Industry Type
Cement

Product Group
Lotherme

Our solution

Product
LOT 352

Size (mm)
4

QTY (Kgs)
30

Product
LOT 468

Size (mm)
4

QTY (Kgs)
30

ANALYSIS

EQUIPMENT
SHOVEL BOOM

BASE METAL
HIGH TENSILE STEEL

MATERIAL HANDLED
LIMESTONE

MODEL
TATA HITACHI 400

WEAR FACTOR
IMPACT AND ABRASION

PROBLEM
CRACK DUE TO IMPACT AND ABRASION

Procedure

1)GRINDING AND CLEANING THE SURFACE AREA.

2)GOUGING THE CRACK AREA

3)GRINDING THE SURFACE AREA.

4) CHECKING THE D P TEST.

5)THEN ROOT LAYER DEPOSITION WITH OUR LOTHERME 352(3.15 MM).

6)MULTI LAYER DEPOSITION WITH OUR

LOTHERME 352(4MM).

7)FINAL LAYER DEPOSITION WITH LOTHERME 468(4MM).

8) PLACING OF SUPPORTING BARS.

Further Reading on Case Studies

WELDING REBUILDING OF RING ROLLING CO-AXIAL ROLL

Read Case Study
Contact Us

Choose any option to contact us

", "alt_tag": "Welding Consumables for the Cement Plants & Industries"}, "division": [{"id": 287, "attributes": [{"id": 1182, "title": "Product", "value": "LOT 352", "division": 287}, {"id": 1183, "title": "Size (mm)", "value": "4", "division": 287}, {"id": 1184, "title": "QTY (Kgs)", "value": "30", "division": 287}, {"id": 1185, "title": "Product", "value": "LOT 468", "division": 287}, {"id": 1186, "title": "Size (mm)", "value": "4", "division": 287}, {"id": 1187, "title": "QTY (Kgs)", "value": "30", "division": 287}], "title": "Our solution", "image1": null, "image1_name": null, "image2": null, "image2_name": null, "case_study": 100}, {"id": 288, "attributes": [], "title": "JOB PICTURES", "image1": null, "image1_name": "Before", "image2": null, "image2_name": "After", "case_study": 100}, {"id": 289, "attributes": [{"id": 1188, "title": "EQUIPMENT", "value": "SHOVEL BOOM", "division": 289}, {"id": 1189, "title": "BASE METAL", "value": "HIGH TENSILE STEEL", "division": 289}, {"id": 1190, "title": "MATERIAL HANDLED", "value": "LIMESTONE", "division": 289}, {"id": 1191, "title": "MODEL", "value": "TATA HITACHI 400", "division": 289}, {"id": 1192, "title": "WEAR FACTOR", "value": "IMPACT AND ABRASION", "division": 289}, {"id": 1193, "title": "PROBLEM", "value": "CRACK DUE TO IMPACT AND ABRASION", "division": 289}], "title": "ANALYSIS", "image1": null, "image1_name": null, "image2": null, "image2_name": null, "case_study": 100}], "title": "Shovel Boom Crack Repair", "creation_date": "2021-04-06T19:16:25.721085+05:30", "procedure": "

1)GRINDING AND CLEANING THE SURFACE AREA.

2)GOUGING THE CRACK AREA

3)GRINDING THE SURFACE AREA.

4) CHECKING THE D P TEST.

5)THEN ROOT LAYER DEPOSITION WITH OUR LOTHERME 352(3.15 MM).

6)MULTI LAYER DEPOSITION WITH OUR

LOTHERME 352(4MM).

7)FINAL LAYER DEPOSITION WITH LOTHERME 468(4MM).

8) PLACING OF SUPPORTING BARS.

", "status": "P", "industry_type": "Cement", "product_group": "Lotherme", "slug": "shovel-boom-crack-repair", "meta_title": "Case Study on Shovel Boom Crack Repair | Cement Plants", "meta_description": "This case study explains shovel boom crack repair was done by the welding process with LoTherme range of products which was designed by D&H Secheron. Click here.", "alt_tag": "

Shovel Boom Crack Repair

", "canonical_tags": "", "schema_tags": "", "search_title": "Shovel Boom Crack Repair", "search_description": "

Shovel Boom Crack Repair

", "category": "Shovel"} ; $(document).ready(function () { $('.Industry_case_container .dropdown_case_study_2 .dropdown-item').on('click', function () { $('.custom-list-case-category span').html($(this).html()) }) $('.Industry_case_container .dropdown_case_study_3 .dropdown-item').on('click', function () { $('.mobile_mr_5 span').html($(this).html()) }) })