Industry Type
Product Group
ANALYSIS
DIMENSIONS (mm) L * Dia
5 * 125
BASE METAL
EN 24
PREVIOUS SOLUTION
First Time
PROBLEM DUE TO
Metal Fatigue caused due to temp of 200 °C and compressive load
NATURE OF PROBLEM
Fatigue and Stress
PROBLEM
Broken in to two parts
DETAILS
Base material : EN 29
EQUIPMENT
Ash Handling Plant
JOB PICTURES
Ash Track Drive Shaft joined by Lotherme 470M
Our solution
QTY (Kgs)
6
Size (mm)
3.15 & 4
Product
Lotherme 470M
Procedure
Proper fixtures and precautions have been taken to
take care of the distortion and bend which can occur
during welding. HT Rods were used inside and outside
the welding as additional reinforcement.
Intermittent welding and stinger beads used