Crane Wheel rebuilding works

Industry Type

Product Group

Our Solution
Product

LOTHERME –HF30 wire

QTY (Kgs)

40

Product

SAF704 Flux

QTY (Kgs)

40

Job Pictures
before
after
ANALYSIS
EQUIPMENT

EOT Crane

BASE METAL

Carbon steel

PROBLEM DUE TO

Friction +Impact

Procedure

1. The surface shall be machined ,cleaned & be made free from cracks prior to weld deposition.

2. The wheel shall be preheated at 250-350 deg c prior to welding and similar inter-pass temperature shall be maintained during welding.

3.Post-weld stress relief heat treatment shall be done at 350-450deg c for 5 to 8 hrs depending on the job.

Further Reading on Case Studies

STEEL INDUSTRY

Crane

Crane Wheel rebuilding works

Read Case Study
Choose Any Option To Contact Us
×

Contact Us


Loading