Buildup In Saddle Bar Of Ropeway Tower

Industry Type
Cement

Product Group
Lotherme

OUR SOLUTION

Product
Lotherme -705

Size (mm)
4

Quantity
12-13 Electrodes

Problem
Wear Out in Saddle bar

Dimensions L×D (mm)
100×150

Previous Solution
LH-115

Job Specific Remarks
There were 20 tower and 2Nos Saddle Bar fixed in one tower.

JOB PICTURES

Job Picture Before Repair

Job Picture Before Repair

Job Picture After Repair

Job Picture After Repair

ANALYSIS

Equipment Name
Ropeway

Base Metal
Cast Iron

Wear Factor
Metal to Metal Friction.

Procedure

  • Clean up the surface area against any fatigue material & other surface contamination.

  • NDT was done for a crack free surface.

  • Preheat the job up to 150°C.

  • Deposit/ Build –up using Lotherme 705, 4.00 mm as considering the bonding with base material.

  •  After buildup, we have covered the welding area using lime for slow cooling of deposit material.

  • After cooling, grinding was done for smooth surface requirement.


Further Reading on Case Studies

WELDING REBUILDING OF RING ROLLING CO-AXIAL ROLL

Read Case Study
Contact Us

Choose any option to contact us

", "alt_tag": "Welding Consumables for the Cement Plants & Industries"}, "division": [{"id": 171, "attributes": [{"id": 668, "title": "Product", "value": "Lotherme -705", "division": 171}, {"id": 669, "title": "Size (mm)", "value": "4", "division": 171}, {"id": 670, "title": "Quantity", "value": "12-13 Electrodes", "division": 171}, {"id": 671, "title": "Problem", "value": "Wear Out in Saddle bar", "division": 171}, {"id": 672, "title": "Dimensions L\u00d7D (mm)", "value": "100\u00d7150", "division": 171}, {"id": 673, "title": "Previous Solution", "value": "LH-115", "division": 171}, {"id": 674, "title": "Job Specific Remarks", "value": "There were 20 tower and 2Nos Saddle Bar fixed in one tower.", "division": 171}], "title": "OUR SOLUTION", "image1": null, "image1_name": null, "image2": null, "image2_name": null, "case_study": 61}, {"id": 172, "attributes": [], "title": "JOB PICTURES", "image1": "https://dnhsecheron-home.s3.amazonaws.com/CaseStudies/Case/saddle_bar.png", "image1_name": "Job Picture Before Repair", "image2": "https://dnhsecheron-home.s3.amazonaws.com/CaseStudies/Case/saddle_bar_02.png", "image2_name": "Job Picture After Repair", "case_study": 61}, {"id": 173, "attributes": [{"id": 675, "title": "Equipment Name", "value": "Ropeway", "division": 173}, {"id": 676, "title": "Base Metal", "value": "Cast Iron", "division": 173}, {"id": 677, "title": "Wear Factor", "value": "Metal to Metal Friction.", "division": 173}], "title": "ANALYSIS", "image1": null, "image1_name": null, "image2": null, "image2_name": null, "case_study": 61}], "title": "Buildup In Saddle Bar Of Ropeway Tower", "creation_date": "2021-01-01T16:28:54.789323+05:30", "procedure": "

", "status": "P", "industry_type": "Cement", "product_group": "Lotherme", "slug": "buildup-in-saddle-bar-of-ropeway-tower", "meta_title": "Case Study on Buildup In Saddle Bar Of Ropeway Tower | Cement Plants", "meta_description": "This case study explains service of buildup in saddle bar of ropeway tower done by welding process with LoTherme range of products which was designed by D&H Secheron. Click here.", "alt_tag": "

Welding Consumables for the Cement Plants & Industries

", "canonical_tags": "", "schema_tags": "", "search_title": "Buildup In Saddle Bar Of Ropeway Tower", "search_description": "

Buildup In Saddle Bar Of Ropeway Tower 

", "category": "Coal"} ; $(document).ready(function () { $('.Industry_case_container .dropdown_case_study_2 .dropdown-item').on('click', function () { $('.custom-list-case-category span').html($(this).html()) }) $('.Industry_case_container .dropdown_case_study_3 .dropdown-item').on('click', function () { $('.mobile_mr_5 span').html($(this).html()) }) })