Excavetor Shovel Hoom Crack Repair Welding.

Industry Type

Cement

Product Group

Lotherme

Our solution
Product

LOTHERM E 352

Size (mm)

3.15

Current (AMPs)

100

Qty. (Kgs)

4

Product

E 510 N

Size (mm)

4.00

Current (AMPs)

120

Qty. (Kgs)

8

Product

LOTHERM E 802

Size (mm)

4.00

Current (AMPs)

200

Qty. (Kgs)

6

JOB PICTURES
Before
After
ANALYSIS
EQUIPMENT

EXCAVETOR SHOVEL

COMPONENT NAME

BOOM

TYPE OF PROBLEM

CRACK

PROBLEM DUE TO

DYNAMIC LOAD HITTING

PREVIOUS SOLUTION

USING WITH 660 NH, NUCLOTECH 2222 N

BASE METAL

HI-TENSILE STEEL

COMP. WEIGHT (kgs)

ATTACHING WITH ORG EQUIPMENT

DIMENSIONS (mm) L * T * W

AS PER THERE DRG. * 30 * 500

Procedure

1. Make the groove by gouging & grinding, throughout the crack both the sides using lot 802 DIA 4mm

2. Preheat the base metal up to 100 dig. Start the root run with lot 352 DIA 3.15mm and followed by second layer also.

3. Multy layers with lot 510N for elongetion and strength.

Further Reading on Case Studies

CEMENT PLANTS

Crane

Excavetor Shovel Hoom Crack Repair Welding.

Read Case Study
Choose Any Option To Contact Us
×

Contact Us


Loading