DIE RECONDITIONING

Industry Type

Product Group

Our solution
Product

LOTHERME 352

Size (mm)

3.15 & 4

QTY (Kgs)

26

Product

LOTHERME 510N

Size (mm)

4

QTY (Kgs)

6

JOB PICTURES
Before
After
ANALYSIS
PRODUCT DETAIL

DIE BLOCK

PROBLEM

Existing die to be scrapped or machined

NATURE OF PROBLEM

Underutilization of existing Die

PROBLEM DUE TO

Customer changed the job design

PREVIOUS SOLUTION

REPLACEM ENT AND RESIZING TO ANOTHER DESIGN

BASE METAL

DIN 2714

NO. OF JOBS

2 (BOTTOM &TOP)

Procedure

Re-dry of electrode : Oven used to re-dry the electrode

Preheat temperature: Job was preheated to 300°C by induction heating

Intermittent temperature: Other than welding area, Job has been completely covered with glass wool and maintained 300°C temperature during welding.

Post heat treatment: SRC has been done at 660°C for 2 hours.

Used LOTHERM E 352 for root and buttering of the job and LOTHERM E 510 N for the final layers.

Further Reading on Case Studies

STEEL INDUSTRY

Die Block

DIE RECONDITIONING

Read Case Study
Choose Any Option To Contact Us
×

Contact Us


Loading