Feed Tube Prepared By Using Scrap

Industry Type

Integrated Steel

Product Group

Lotherme

OUR SOLUTION
Product

Lotherme -510N

Size (mm)

3.15, 4.00

Current (amps)

80-90, 120-140

Quantity (Kgs)

30, 40

Process

"Manual Metal Arc Welding With The Source Of Rectifier 400Amps"

JOB PICTURES
ANALYSIS
Equipment Name

Spong Iron Klin Of 500Tpd

Component Name

Feed Tube

Type Of Problem

Wornout

Problem Due To

Hot Flue Gases In The Klin & Height Of Raw Material Fall Is Very High

Previous Solution

It Was Declared As Scrap

Base Metal

HK-40

Comp. Weight (Kgs)

Approx 1 Ton

Dimensions (mm)

500 x 25 x 460

Procedure

1. Collected two numbers of scraped feed tubes which were declared as scrap and managed to cut the required lengths with the help of plasma cutting machine.

2. Made the ‘v’ groove for the two joints, carried out the two layers of route run with lotherme 510n of 3.15mm

3. Successfully completed the job with lotherme-510 of 4mm.

4. Manpower and accessories provided by the bmm only, and we have supervised the job on free of cost